See how much you could save using our Eco-Grid here.
Home > Case Studies
Managing significant flood risks without the use of diesel equipment.
Temporary power requirement to maintain a stable temperature for data equipment.
Partnering with Jackson Civil Engineering to design a sustainable off-grid power solution at Wansford Lock.
Illuminating a work site efficiently while minimising disturbances with the TCP TH200 mobile lighting tower.
Providing an in-depth energy consultation for Jackson Civil Engineering to achieve a significant reduction in energy consumption on-site.
Collaborating with the Environment Agency and Kier on a solar and green hydrogen project in Bridgwater, Somerset.